Copy of NSTS Testing
The Sustainable Use Directive (SUD) requires that all pesticide application equipment (PAE) is tested on a regular basis*
Any machine applying pesticides after 26/11/16 must be tested by the relevant dates. Timescales of test vary depending on type and size of equipment.
Boom sprayers over 3 metres wide, air blast sprayers, train and aircraft sprayers (includes Red Tractor Livestock Assurance Schemes)
1. Tested by 26/11/16 OR first test due before the machine is 5 years old
2. Re-test within 5 years up to 2020
3. After 2020 re-test every 3 years
Boom sprayers 3 metres and under and other types of PAE to include slug pellet applicators, micro-granular applicators, weed wipers, seed treatment and other specialist application equipment
1. Tested by 26/11/16 OR first test due before the machine is 5 years old
2. Re-test every 6 years
Knapsack, handheld and pedestrian equipment
1. Do not require a formal test but need to be checked
2. You should keep a record of the inspection – a checklist is available from the NSTS website
Crops and Fresh Produce Assurance Scheme requirements
1. Annual testing for sprayers over 3 metres inc. air blast sprayers
2. Annual testing of nematicide applicators
3. All other equipment to SUD requirements
*The legal requirements are contained in the Plant Protection Products (Sustainable Use) Regulations 2012